RB MAJU CONSTRUCTION SDN BHD

General Civil Engineering & Building Contractor

Our Project

YEARPROJECTSCOPECLIENTCONTRACT SUM (RM)STATUS
2024Privatisation of Lebuhraya Persisiran Pantai Barat
(Taiping – Banting) Selangor Phase 1 – Sec 3
Drainage WorksIJM Construction Sdn Bhd574,378.40Completed
2024Proposed Construction of Infrastructurak Works  On Lot 86608 (PLOT 1) Off Jln Sungai Pinang 5/8, Tmn Perindustrial Pulau Indah 2, Port Klang.Drainage WorksNorth West Terminal Sdn Bhd570,493.00In Progress
2024Proposed Construction of Infrastructurak Works  On Lot 86608 (PLOT 1) Off Jln Sungai Pinang 5/8, Tmn Perindustrial Pulau Indah 2, Port Klang.RC Slab and RC PavementNorth West Terminal Sdn Bhd1,493,688.00In Progress
2024Provision of Engineering Procurement, Constructions
Installation Testing & Commissioning (“EPCC”) of
A 50MWAC Solar Photovoltaic Plant at Mukim
Kuala Pahang, Daerah Pekan, Pahang Darul Makmur.
Drainage WorksFabulous Sunview Sdn Bhd           1,006,755.60In Progress
2024Proposed Development of Kota Seri LangatDrainage WorksWCE Maju Sdn Bhd              454,205.00Completed
2023Proposed of Reinforced Concrete Structure at
Persisiran Pantai Barat (Taiping – Banting)
Section 7B2
Wash TroughAdvancecon Infra Sdn. Bhd.66,000.00Completed
2022Proposed of Development of Kota Seri LangatDrainage WorksSeri Langat Construction Sdn Bhd863,899.00Completed
2020Proposed of Drainage Works ( CH22500 to
Banting Interchange) – Section 1
Drainage WorksGabungan Cekapbina Sdn Bhd3,568,320.00Completed
2020Proposed of Supply & Construct Piled  Embankment Slab and Pile Plug – Section 7PE Slab WorksGabungan Cekapbina Sdn Bhd2,761,482.00Completed
2019Proposed Reinforced Concrete Wall –  Kuchai Link 2Retaining WallIJM Construction Sdn. Bhd.1,980,000.00Completed
2019Proposed Drainage Works of West Coast  Expressway – (NNKSB Interchange To Kapar Interchange) Sec 3, 4, 5, 8 & 9Drainage WorksIJM Construction Sdn. Bhd.1,156,122.00Completed
2019Proposed Drainage Works of Lebuhraya Pantai Barat (Taiping-Banting) Selangor Alignment –  Phase 1 (Section 5) at Toll Plaza Drainage WorksIJM Construction Sdn. Bhd.646,300.00Completed
2019Proposed Reinforced Concrete Works For Works  of West Coast Section 6 (Kapar Interchange  To Assam Jawa Interchange) PE Slab WorksGanda Imbuhan Sdn Bhd5,540,686.24Completed
2019Proposed LRT 3 Package GS07-08 for Light  Rail Transit Line 3 (LRT 3) from Bandar Utama  to Johan SetiaDrainage WorksSunway Construction Sdn Bhd604,711.09Completed
2019Proposed of Upkeeping Parking Areas of  Lebuhraya Pesisiran Pantai Barat (Taiping –  Banting), Selangor Alignment Phase 1Upkeeping Parking AreasGanda Imbuhan Sdn Bhd29,160.00Completed
2019Proposed of Temp. Bridge Concrete Block of Lebuhraya Pesisiran Pantai Barat (Taiping –  Banting), Selangor Alignment Phase 1Temp. Bridge Concrete
Block
Ganda Imbuhan Sdn Bhd24,000.00Completed
2019Proposed of Drainage Works (Package A)
for West Coast Expressway for Package Sec 6
Drainage WorksGanda Imbuhan Sdn Bhd7,903,124.50Completed
2019Proposed of Precast Concrete Box Culvert  for West Coast Expressway for Package Sec 6Box CulvertGanda Imbuhan Sdn Bhd3,599,976.70Completed
2019Proposed of Slab Protection at Petronas Gas
Pipe at CH14707.579m for Sec 6
Slab ProtectionGanda Imbuhan Sdn Bhd1,180,000.00Completed
2018Proposed Reinforced Concrete Pile Slab and
Installation of Precast Box Culvert – Kuchai Link 2
Slab WorksIJM Construction Sdn. Bhd.1,850,000.00Completed
2018Proposed New Jersey Barrier (NJB), Road Kerb
& Walkway – PSP
New Jersey BarrierIJM Construction Sdn. Bhd.294,685.00Completed
2018Proposed RC Works for Retaining Wall I3 at
Jln Ipoh – V203
Retaining WallIJM Construction Sdn. Bhd.1,566,393.66Completed
2017Proposed Drainage Works of West Coast
Expressway – (NNKSB Interchange To Kapar
Interchange
Drainage WorksIJM Construction Sdn. Bhd.10,599,821.50Completed
2017PSP – NPE InterchangeTemporary Drainage DiversonIJM Construction Sdn. Bhd.83,845.00Completed
2017Proposed Slab Protection Works of MRT
Laluan 2 : Jajaran Sungai Buloh – Serdang –
Putrajaya (Package V203)
Slab WorksIJM Construction Sdn. Bhd.599,756.00Completed
2017Proposed Drainage Works of West Coast
Expressway – (NNKSB Interchange To Kapar
Interchange)
RC Box Culvert for Pipe
Protection
KT Law & Associates Sdn Bhd442,158.00Completed
2016Lebuhraya Pantai Baru – Kuchai LinkDrainage WorksAlpha Scapes (M0 Sdn Bhd690,000.00Completed
2016Proposed Temporary Reinforced Concrete
Footings, Schedule Waste Storage & Boom Gate
Reinforced Concrete FootingsAlpha Scapes (M0 Sdn Bhd184,900.00Completed
2016Proposed Drainage Works of MRT Package V5
Mass Rapid Transit Lembah Kelang : Jajaran
Sungai Buloh – Kajang – Station 026 Bus/Taxi
Layby
Drainage WorksIJM Construction Sdn. Bhd.920,000.00Completed
2015Privatisation of Lebuhraya Persisiran Pantai Barat
(Taiping – Banting)
Pile Embankment SlabIJM Construction Sdn. Bhd.5,700,000.00Completed
2015Lebuhraya Pantai Baru – Kuchai LinkTemporary Drainage DiversionIJM Construction Sdn. Bhd.23,470.00Completed
2014Proposed Drainage Works of MRT Package V5
Mass Rapid Transit Lembah Kelang : Jajaran
Sungai Buloh – Kajang
Temporary Drainage & Reinforced Concrete WorksIJM Construction Sdn. Bhd.1,630,705.08Completed
2012Proposed Drainage Works of MRT Package V5
Mass Rapid Transit Lembah Kelang : Jajaran
Sungai Buloh – Kajang
Drainage WorksIJM Construction Sdn. Bhd.4,659,911.19Completed
2010Proposed Drainage Works of ROB 2,3,4 & 5
Electrified Double Track Project Between
Seremban And Gemas Package 1 (KM461.234 to
KM 500.400)
Drainage WorksIJM-Norwest Joint Venture1,996,561.10Completed
2010Proposed Drainage Works of RUB 1& ROB 1
Electrified Double Track Project Between
Seremban And Gemas Package 1 (KM461.234 to
KM 500.400)
Drainage WorksIJM-Norwest Joint Venture1,007,000.00Completed
2010Projek Sambungan Lebuhraya Sungai BesiDrainage WorksIJM Road Builder (M) Sdn. Bhd.8,297,729.97Completed
2009Proposed Drainage Works of Sek. Keb.
Kuala Ampang 2, Ampang.
Drainage WorksRockfound Builders Sdn. Bhd.1,040,000.00Completed
2008Proposed Construction of Sri Kaliamman
Temple in Chemor, Perak.
Civil & StructureKanthan Sri Kaliammam Temple850,000.00Completed
2008Proposed Drainage Works of Sek. Keb.
Seri Putra in Bandar Seri Putra, Kajang.
Drainage WorksRockfound Builders Sdn. Bhd.404,000.00Completed
2008Proposed Drainage Works of Sek. Keb.
Seri Putra in Bandar Seri Putra, Kajang.
Road WorksRockfound Builders Sdn. Bhd.225,000.00Completed
2008Proposed of Electrified Double Track Project Between Seremban, Gemas  Package 1 (KM 461.234 to KM 500.400) Package C – DDrainage WorksIJM-Norwest Joint Venture8,665,407.53Completed
2007Proposed Third Lane Widening Between  Tanjong Malim & Slim RiverDrainage WorksUEM Construction Sdn. Bhd.5,000,000.00Completed
2007Proposed Test Track In Serendah
For Tan Chong & Sons Motor Co.
Concrete PavementYBK Technology Sdn. Bhd.102,483.00Completed
2007Proposed Drainage & Road Works In
Serendah for Tan Chong & Sons Co.
Drainage & Road WorksYBK Engineering Sdn. Bhd.350,000.00Completed
2007Proposed Third Lane Widening Between
Tanjong Malim & Slim River
Maintenance WorksUEM Construction Sdn. Bhd.1,200,000.00Completed
2006Proposed Third Lane Widening Between
Tanjong Malim & Slim River
Drainage WorksTitian Muda Sdn. Bhd.432,415.00Completed
2005Balakong Interchange, Sg Besi Highway
Mines Resorts
Close TurfingRoad Builder (M) Sdn. Bhd.29,000.00Completed
2005Mixed Development for Koperasi Kakitangan
Malaysia Airport Berhad
Chain Link Fencing &
Entrance Gate
SAAG-Embah Engineering
Sdn. Bhd.
966,122.00Completed
2005Mixed Development for Koperasi Kakitangan
Malaysia Airport Berhad
Drainage WorksSAAG-Embah Engineering
Sdn. Bhd.
2,675,709.15Completed
2005Tapak Projek Pejabat Peguam NegaraClose TurfingRoad Builder (M) Sdn. Bhd.7,800.00Completed
2004New Pantai Highway
Tujuan Jengka & Kewajipan Interchange
Drainage WorksAlpha Scapes (M) Sdn. Bhd.1,523,261.00Completed
2003Kem Kementah Pakej 2Close TurfingStrong Remark Sdn. Bhd.90,000.00Completed
2003Kem Kementah Pakej 3Close TurfingTrans MSB Sdn. Bhd.84,500.00Completed
2003Country Heights Wonderland BalakongClose TurfingInfra Segi Sdn. Bhd.210,000.00Completed
2003Bungalow Zone (Phase 1C, 1E & 1F)
Mutiara Damansara
Close TurfingInfra Segi Sdn. Bhd.37,000.00Completed
2003Proton Plant, Proton City Tanjung MalimClose TurfingRoad Builder (M) Sdn. Bhd.417,073.20Completed
2003Alamanda, Putrajaya Parcel Z9Close TurfingRoad Builder (M) Sdn. Bhd.89,500.00Completed
2003New Pantai HighwayDrainage WorksAlpha Scapes (M) Sdn. Bhd.117,750.00Completed
2002Indah Resort Homes, Kota DamansaraClose TurfingDekon Tajul Nursery &  Landscaping Sdn. Bhd.226,540.00Completed
2002New Pantai HighwayClose TurfingRoad Builders (M) Sdn. Bhd.450,550.00Completed
2002Membina “Missing Link” Kajang BypassClose TurfingMillennium Achievers Sdn. Bhd.62,500.00Completed
2002Kapar – Sabak Bernam dan  Klang – Banting HighwayClose TurfingAsaplus Enterprise Sdn. Bhd.230,000.00Completed
2002Country Heights DamansaraTurfing & HydroseedingInfra Segi Sdn. Bhd.300,000.00Completed
2002Construction of 32 Units of Semi Detached  Bungalow, Klang.Civil & StructureMTDC Sdn. Bhd.1,050,000.00Completed
2002Kampung KrenchiRoad WorksHirah Jaya (M) Sdn. Bhd.35,672.00Completed
2002Jalan Kuchai LamaRoad WorksAlpha Project Sdn. Bhd.83,455.00Completed
2001Damai Taktif Development DamansaraClose TurfingDamai Taktif Development Sdn. Bhd.59,986.00Completed
2001Jalan Shah Alam – Batu Arang Fasa 2BClose TurfingBVN Mewah Sdn. Bhd.519,030.50Completed
2001Pembinaan Empangan JUS Pakej A, MelakaTurfing & HydroseedingBVN Mewah Sdn. Bhd.467,212.00Completed
2000Pusat Kesihatan, Tadika 1, Tadika 2 &
Terminal Bas KLIA
Close TurfingNegara Properties Builders Sdn. Bhd.80,000.00
2000KLIA QuartersGrass CuttingNegara Properties Builders Sdn. Bhd.45,500.00
2000Damansara PerdanaClose TurfingPilecon Geotechnics Sdn. Bhd.94,000.00
2000Salak Tinggi Highway KLIAClose TurfingBena Puri Sdn. Bhd.71,180.00
1999KBSM Kuarters KLIA NilaiClose TurfingNegara Properties Builders Sdn. Bhd.80,320.00
1999Pusat Kuarentin KLIAHydro-SeedingLankhorst Pancabumi Contractors  Sdn. Bhd.45,115.00
1998KLIA Bhd Package SA – 02Close TurfingLankhorst Pancabumi Contractors  Sdn. Bhd.94,520.00
1998Cheras – Kajang HighwayClose TurfingMube Bina Sdn. Bhd.84,155.00
1998Sewer Treatment Plant (PKNS)  Bandar Baru BangiClose TurfingPembinaan Nilam (M) Sdn. Bhd.93,940.00
1998PLUS, UPM Toll PlazaClose TurfingAsah Cemerlang Ent48,670.00
1997Lebuhraya Damansara – PuchongClose TurfingPRK Builders Sdn. Bhd.148,500.00
1997Kuarters Kakitangan Awam KLIAClose TurfingNegara Properties (M) Sdn. Bhd.903,303.00
1996Cheras Kajang HighwayTree CuttingBridgecon Engineering Sdn. Bhd.180,000.00Completed
1996Main Acess PJS 7/1 Bandar SunwayRemoval and Relocation TreesSunway Nursery Sdn. Bhd.161,690.00Completed
1996Bukit Tinggi, BentongClose TurfingWPP Eartworks Cons Sdn. Bhd.120,000.00Completed